16.01.2014
VSC-3 contract awarded
VSC consortium places order for VSC-3 with ClusterVision
On January 16, 2014, the Vienna Scientific Cluster (VSC) consortium has placed an order for the new VSC-3 cluster system.
The VSC-3 is an HPC system that will be installed in June 2014 at the Arsenal TU building (Objekt 214) in Vienna by
ClusterVision.
It will consist of about 2000 nodes, each equipped with 2 processors (
Intel Xeon E5-2650v2, 2.6 GHz, 8 cores from the
Ivy Bridge-EP family) and internally connected with an Intel QDR-80 dual-link high-speed InfiniBand fabric.
Energy-efficient cooling will be provided by the mineral-oil based CarnotJet System of
Green Revolution Cooling.
See also: Press coverage on VSC-3 and Details about VSC-3
(Announcement posted on 16.01.2014.)